Mechanical, Electrical & Plumbing (MEP)

Turnkey building services engineering, industrial HVAC ducting and chilled water networks, high-voltage power distribution, certified life safety fire suppression, and precision sanitary systems executed across Saudi Arabia.

Governing Code SBC-401 / SBC-501 / NFPA
Standard System ASHRAE 90.1 / SMACNA / IEEE
Life Safety Approval Civil Defense Certified Installation
Mobilization Zone Riyadh & Central Province
Elevate Builders MEP engineering installation showing overhead cable trays, ducted HVAC systems, and fire protection piping in Riyadh
ENGINEERING BREAKDOWN

Comprehensive building services engineered for continuous uptime and regulatory compliance.

05.1 // HVAC & CLIMATE CONTROL

HVAC & Air Distribution

Chilled water piping, AHU/FCU plant installations, galvanized spiral and rectangular ductwork fabricated to SMACNA standards, VRF/VRV multi-split systems, and exhaust smoke extraction.

  • ASHRAE 90.1 energy performance
  • Aerofoil dampers & acoustic lining
05.2 // ELECTRICAL POWER

LV & MV Power Distribution

Main distribution boards (MDBs/SMDBs), dry-type step-down transformers, heavy copper busway trunks, cable ladder routing, motor control centers (MCC), and emergency standby diesel generator synchronization.

  • SEC-approved substation coordination
  • Form 4b type-tested switchgear panels
05.3 // LIFE SAFETY

Fire Protection & Suppression

Civil Defense certified wet and dry pipe sprinkler systems, UL/FM diesel and electric fire booster pumps, clean-agent FM200/Novec gas suppression for mission-critical IT rooms, and landing hose reels.

  • NFPA 13 & 14 compliant hydraulics
  • Civil Defense inspection sign-off support
05.4 // PLUMBING & DRAINAGE

Domestic Water & Drainage

Multi-stage VFD pressure booster pump stations, thermal PPR and cross-linked PEX water lines, acoustic UPVC gravity soil and waste stacks, grease interceptors, and rainwater harvesting sumps.

  • SBC-501 sanitary plumbing code
  • Hydrostatic testing at 1.5x design pressure
05.5 // LOW CURRENT & AUTOMATION

BMS, Security & Telecom

Centralized Building Management Systems (BACnet/Modbus BMS), Cat6A and multi-core optical fiber structured cabling, IP CCTV video security networks, access control gates, and public address evacuation.

  • High-density server room rack containment
  • CITC certified cabling standards
05.6 // COMMISSIONING

Testing, Adjusting & Balancing (TAB)

Full pre-commissioning air volume calibration, hydronic valve balancing, calibrated infrared thermographic panel audits, Megger insulation verification, and integrated system commissioning.

  • NEBB / AABC procedural standards
  • Detailed closeout documentation & O&M manuals
QA/QC REGIME

MEP Testing & Commissioning Verification

GOVERNED UNDER ISO 9001:2015
Testing Package Standard / Code Testing Protocol Acceptance Criteria
Hydrostatic Pipe Pressure Test NFPA 13 / SBC-501 All chilled water & fire sprinkler circuits Tested at 200 psi (or 1.5x working pressure) for 2 hours with zero pressure drop
Megger Insulation Resistance SBC-401 / IEEE 43 All primary feeder cables & switchboard busbars 1000V DC test yielding ≥ 50 MΩ phase-to-phase and phase-to-earth resistance
Air Flow & Duct Leakage (TAB) SMACNA / NEBB Standards 100% of supply, return & exhaust duct branches Air volume within ±10% design CFM; Class 3 leakage compliance
Life Safety & Fire Alarm Integration NFPA 72 / Civil Defense Complete loop, detector & sounder actuation 100% addressable triggering, elevator recall & HVAC smoke damper trips
DIRECT PROCUREMENT LIAISON

Ready to submit MEP drawings or request a technical BoQ review?

Our Riyadh engineering team reviews single-line diagrams (SLD), mechanical equipment schedules, and load calculations. We respond with formal technical proposals within 48 business hours.